From estimates
to environmental integrity.

What the source concept calculates, what it does not establish, and what must happen before a SCWG Compact 5 installation can claim independently verified and registry-issued carbon credits.

01. SCWG Compact 5: the reference scenario

The October 30, 2026 AORANGI.CC concept v0.5 uses a palm-oil mill effluent (POME) reference installation. The data below are the document's assumptions, not independently validated performance statements.

ParameterConcept valueWhat it describes
GEM gas volume800 m³/hIllustrative process output
GEM composition60% CH₄ / 40% H₂Gas-volume fraction assumption
Internal energy use20%Feed preparation, pumping, thermal/auxiliary systems
Electricity to mill700 kW (28%)Energy delivered to the POME owner, without charge
GEM to methanol52%Process-energy allocation
Green methanol~580 L/hProposed saleable product output
Operating hours8,000 h/yearAnnual projection baseline

The source includes overlapping descriptions of generator supply and gas allocation; detailed engineering and mass/energy balances must be reconciled before commercial use.

Language on this site: “modeled climate benefit” or “potential carbon value” refers to the concept's calculation. “Issued carbon credit” refers only to a unit created by an authorized registry after its required validation and verification steps. They are not interchangeable.

02. The three calculation pathways

A / Methane baseline comparison

The concept assumes 800 m³/h GEM containing 60% methane, leading to 480 m³/h and approximately 0.3437 t CH₄/h. Using the document's 100-year GWP assumption of 28 produces:

0.3437 t CH₄/h × 28 = 9.62 t CO₂e/h (source estimate).

Critical condition: methane formed as a useful product inside SCWG is not automatically methane that would otherwise have entered the atmosphere. Crediting requires a counterfactual POME-management baseline, monitored waste characteristics, methane potential, any baseline capture/destruction, leakage and project emissions. Modern methodology rules may prescribe a different GWP factor.

B / Electricity displacement

The concept supplies 0.7 MWh each operating hour, multiplied by an assumed local grid factor of 0.7 t CO₂/MWh:

0.7 MWh/h × 0.7 t CO₂/MWh = 0.49 t CO₂e/h (source estimate).

The correct emission factor must reflect the country, utility/grid area and applicable methodology vintage. The analysis must establish which entity claims the electricity attributes and avoid claiming the same renewable benefit in multiple programs.

C / Methanol substitution

The source applies a 1.5 t CO₂e per tonne displacement factor to 0.5 tonnes of green methanol per hour:

0.5 t methanol/h × 1.5 t CO₂e/t = 0.75 t CO₂e/h (source estimate).

Methanol is generally used or combusted eventually, so its carbon is not permanently stored merely because it enters the liquid product. Crediting depends on feedstock carbon origin, process emissions, additional inputs, market substitution, end use and lifecycle boundaries. Any CO₂ recovered from generation exhaust must be counted consistently.

D / Annual sum — a scenario, not issuance

Contributiont CO₂e/hAt 8,000 h/year
Methane baseline9.6276,960
Electricity substitution0.493,920
Methanol substitution0.756,000
Simple sum10.8686,880

This arithmetic reproduces the document's result. It does not establish which components can be combined in one registrable project; overlapping claims or methodologies may require exclusions or separate accounting.

03. From industrial measurements to issued credits

Digital MRV improves traceability, speed and audit readiness. It cannot bypass applicable standards. The proposed path should distinguish the internal evidence lifecycle from legally recognized environmental units:

1
Define the project & methodology

Identify project proponents and the applicable recognized carbon standard. Confirm a methodology covers the POME / SCWG process and the intended claim boundaries.

2
Establish baseline and additionality

Document what would happen to the waste and electricity without Compact 5; establish project emissions, leakage and additionality.

3
Calibrate and monitor

Measure feedstock properties, gas volumes/composition, electricity, methanol, operating hours, energy imports and relevant emissions under the approved monitoring plan.

4
Independent validation / verification

Appoint an approved validation/verification body (VVB). Technical consortium validators can support the evidence trail but do not replace the independent VVB.

5
Registry approval and issuance

After the required review, the issuing registry may issue serialized environmental units. Until then, AORANGI.CC internal records must not be represented as issued credits.

6
Transfer, retirement and reconciliation

Track each serial number, custody change and retirement. Any digital token must remain mapped to the registry unit with no double issuance or double spending.

04. Climate accounting integrity controls

  • Eligible baseline: avoid treating all energy-rich methane within a product stream as avoided atmospheric methane.
  • Additionality: demonstrate the project provides eligible improvements beyond business-as-usual.
  • Lifecycle emissions: include auxiliary energy, materials, chemicals, upstream transport and downstream fuel use where required.
  • Single environmental claim: avoid overlap across methane, electricity and methanol attributes, and across producer, waste owner and buyer claims.
  • Conservative uncertainty: document instrument accuracy, calibration intervals, missing data, downtime and reporting rules.
  • Registry uniqueness: link any on-chain representation to actual unit identifiers and lock/unlock/burn as needed to prevent double circulation.
  • External review: carbon accounting, regulatory eligibility and bank-related representations should be checked by qualified independent specialists before public fundraising or selling units.

05. Evidence the dMRV layer should collect

A proposed plant audit record connects hardware and environmental claims. At minimum it should contain the following fields, with retention and access restrictions appropriate to commercial confidentiality and applicable data protection law.

Evidence familyFields to capture
Origin & identitySite / SPV ID, unit serial, geolocation, calibrated sensor IDs, firmware and configuration
FeedstockPOME mass flow, solids/moisture, composition, relevant methane potential, origin
OperationTemperatures, pressures, flow, downtime, starts/stops, alarm record
OutputGEM flow/composition, net electricity delivered, methanol mass/volume and quality
GHG ledgerProject / baseline emissions, methodology version, uncertainty, monitoring period
Audit metadataUTC timestamp, signature, record hash, validator attestation, audit logs
Credit lifecycleRegistry, project ID, issuance batch, serial numbers, owner, transfers and retirement

Architecture note: Matrix is suitable for secure messaging/federation; a Synapse homeserver is not in itself a blockchain consensus engine. The permissioned ledger, smart contracts, auditing interfaces and registry reconciliation are independent services to be designed and security-tested.

06. Reference documents

Primary source: AORANGI.CC — Carbon Credits from Compact 5 and everything you wanted to ask but didn't! v0.5, 30 October 2026, especially sections 1–8 and 10–14.

External methodological context: Verra Verified Carbon Standard and Verra Registry Overview. In February 2026, Verra reported first DMRV pilot issuances, demonstrating that digital MRV can streamline evidence within verification and issuance rules rather than replacing them. See the announcement ↗.

All source figures are preliminary; none on this site constitutes a guarantee of carbon credits, emissions performance or financial returns.