01. SPV economics: two different pools
Under the concept, I2C5 finances 100% of the specified CAPEX, while AORANGI contributes technology and architecture. The local SPV model has two distinct distributions: revenue from green methanol and the rights to eligible environmental units.
A / Carbon credit entitlement, final proposed model
| Beneficiary | Share | Economic rationale |
|---|---|---|
| AORANGI GROUP AG, Zug | 70% | IP, system design, global governance and holding treasury |
| I2C5 — investing partner | 25% | CAPEX financing and project exposure |
| Technical consortium pool | 5% | Hardware, telemetry and network integrity responsibilities |
| Total | 100% | Proposed distribution after eligible credits are established |
The source's final carbon allocation is 70/25/5. An earlier paragraph describes a 75% AORANGI / 25% investor starting position. The proposed 5% validators' share is carved out of the former AORANGI portion; the I2C5 stake remains 25%.
B / Green methanol revenue entitlement
| Beneficiary | Share | Output equivalent (~580 L/h) |
|---|---|---|
| I2C5 investing partner | 75% | ~435 L/h |
| AORANGI GROUP AG | 22% | ~127.6 L/h |
| Technical consortium | 3% | ~17.4 L/h total |
| Total | 100% | ~580 L/h |
The 22% + 3% split replaces the original 25% AORANGI methanol quota. In the concept the 3% is split equally, 1% to each technical partner. Values are approximate; the source rounds some litre equivalents.
Separate legal rights: economic allocation of a future credit is not necessarily the same as registry ownership, the right to claim an emission reduction, or ownership of a corresponding token. All three must be explicitly defined in the project documents.
02. The validator consortium
The document assigns 5% of the modeled carbon asset pool to three technical contributors. These parties can give strong evidence of system integrity, but their roles are not a substitute for an independent accredited carbon verification body.
| Technical validator | Credit pool share | Principal assurance |
|---|---|---|
| Equipment manufacturer | 2.0% | Device identity, DMLS / SiC reactor, sensor hardware and digital twin |
| SCADA / IoT designer | 1.5% | Sensor telemetry and signed data integrity |
| Matrix / ledger software contractor | 1.5% | Evidence processing, consensus logic and allocation rules |
| Total | 5.0% | Technical integrity consortium |
All three partners also receive 1% of the green methanol revenue pool apiece, funded out of AORANGI's original share, to support operations, system monitoring and maintenance.
03. Proposed time-lock and vesting mechanism
Under the proposal, the validator pool's 5% allocation enters a controlled smart-contract or custody account rather than a freely transferable balance.
The concept prohibits token transfer, wrapping and settlement during the first 12 months after the relevant batch timestamp.
After the lock ends, the 5% pool is released over the following 24 months at approximately 4.1667% of the original locked batch each month.
Slashing proposal
The document also contemplates up to 100% forfeiture of currently locked validator tokens following a consortium governance vote for severe breaches, deliberate data omissions or node outages greater than 48 consecutive hours. Such penalties require clear agreements, proportionality, due process, cybersecurity protections and applicable legal review.
04. Permissioned evidence and asset architecture
The proposed AORANGI.CC system combines SCWG telemetry, a Matrix communications layer, a separately implemented permissioned ledger and rules-based wallet permissions. The concept mentions ERC-3643 as a compliance-oriented token standard.
- Technical roles: plant SCADA and factory validator attest that the physical data originate from a valid, calibrated source.
- Ledger roles: permissioned network nodes track evidence provenance and policy-controlled asset movements.
- External assurance: accredited verifiers and registries retain the legal authority required for recognized carbon-credit issuance.
- Regulated token transfers: wallet ownership, sanctioned-party screening, KYC/AML eligibility and transfer restrictions must be aligned with actual jurisdictions.
- Uniqueness: token issuance should be paired 1:1 with registry-controlled units or follow the governing registry's permitted tokenization framework; retirement needs synchronized state.
Current state: descriptions of Matrix/Synapse, L1 consensus, bank-linked issuance and immediate token liquidity in the source are proposed architecture. They do not establish that such infrastructure is presently connected, independently audited, licensed or accepted by a registry.
05. Proposed banking and settlement loop
The source envisions a Swiss holding treasury with proposed banking relationships or acquisitions in Vanuatu and Australia and downstream reinvestment in Croatian/Slovenian industrial production. This is presented here as a strategic design, not a representation that those banks belong to AORANGI or that any specific entity has obtained a banking license.
I2C5 funds agreed manufacturing, software and implementation expenditures under definitive contracts.
Compact 5 units process POME, supplying free mill electricity and output for green methanol production.
The evidence layer records modeled environmental performance and supports external methodology verification.
After actual registry issuance, entitlement allocation and any approved digital representation may be reflected in the ledger.
Any financial institution facilitating trading, custody or fiat settlement must be correctly licensed and independently compliant with banking, securities, AML, tax and cross-border requirements.
The concept's transaction design is useful as a development blueprint but should not be published as a guaranteed banking clearing route or liquidity product.
06. Evidence-based public reporting
A future investor and public explorer could report deployment status at the level of each SPV and plant, including:
- Unit serial number, installation location, equipment certificate and commercial operations date.
- Project methodology, registration identifier, accredited verifier and status.
- Audited operating hours, feedstock mass, electricity output and methanol production.
- Measured emissions baseline and actual verified result for each monitoring period.
- Unique registry credit batch/serial numbers, allocated beneficiary wallet and retirement state.
- Validator attestations and governance decisions with conflict-of-interest safeguards.
Investor-facing principle: until a source can be linked to a project registration, verifiable operational data and actual registry issuance, the interface must show planned, modeled or under review — never “issued,” “sold,” “retired” or “live.”
Based on AORANGI.CC concept v0.5 (October 30, 2026), especially sections 12–14. Read Methodology & Safeguards ↗.